Track Perlan 140 * Track for sliding door fitting
- Track for sliding door fitting with leaf weight up to 140 kg
Application Areas
- For leaf weights up to 140 kg
- For timber, plastic, glass and metal leaves
- Suitable for Perlan roller carriage
Technical data
| Track Perlan 140 | |
| Leaf weight (max.) | 140 kg |
Downloads
Product shot
Supplementary sheet
Wiring diagram
User manual
Installation instructions
Installation drawing
Product data sheet
Variants & Accessories
* Notice about the products displayed
The products mentioned above may vary in form, type, characteristics and function (design, dimensions, availability, approvals, standards etc.) depending on the country. For questions please contact your GEZE contact person or send us an E-Mail .