Accessories set basic components Perlan 140

Roller carriage without suspension bolt * Roller carriage for leaf weights up to 140 kg

Perlan roller carriage tif, highres, Perlan rolling cart
  • Roller carriage without suspension bolt for leaf weights up to 140 kg
Contact us

Application Areas

  • For leaf weights up to 140 kg
  • For timber, plastic, glass and metal leaves
  • For Perlan sliding door fitting

Technical data

Roller carriage without suspension bolt
Leaf weight (max.) 140 kg

Downloads

Product shot

Product data sheet

User manual

Installation instructions

Wiring diagram

Supplementary sheet

Installation drawing

Variants & Accessories

Contact

GEZE Central +46-8-732-34-00